Subject:
Revision to Impeller Assembly Process
Effective August, 2006
To Be Used With Model and IOM Form Number:
NPE – IM013
ADDENDUM
Installation, Operation and Maintenance Instructions
DISASSEMBLY: To remove impeller, apply localized heat to the impeller hub to a
temperature between 150
o
C - 250
o
C. Heat Impeller hub for 1-3 minutes. This will
decrease the breakloose strength of the Loctite 271 and allow for easy removal.
ASSEMBLY: To install impeller clean shaft thoroughly with denatured alcohol let dry.
Apply Loctite 7649 primer to shaft, impeller threads and allow 3-5 minutes to dry.
Apply 3 drops of Loctite 271 high strength threadlocker to shaft threads and 2 drops to
the impeller threads. Tighten impeller and jam nut to 144 lb-in or 12 lb-ft. Allow
impeller to cure for 30 minutes before testing or running.
INSTRUCTION MANUAL
IM200
Vista de página 0
1 2

Resumo do Conteúdo

Página 1 - ADDENDUM

Subject: Revision to Impeller Assembly ProcessEffective August, 2006To Be Used With Model and IOM Form Number: NPE – IM013ADDENDUMInstallation, Operat

Página 2 - Xylem Inc

Goulds is a registered trademark of Goulds Pumps, Inc. and is used under license.© 2012 Xylem Inc. IM200 Revision Number 1 July 2012Xylem Inc.2

Comentários a estes Manuais

Sem comentários