
MANUAL
GB CHATTER BASE SYSTEM SETUP TOOL 1303
9
Preparations
Push the cover to the right to open it.
Make sure the SIM-card is positioned correctly, see the
markings in the picture.
Push the cover to the left to close it.
Logger is for mounting on a tube.
connect the antenna to the GPRS modem. The connector must
'click' in place.
Connect one end of a USB cable to the PC, the other end to the
Comentários a estes Manuais