• Before using this product read and understand instructions.• Save these instructions for future reference.• All work must be performed by qualified
2OFFONSTEP 1 - Removal and Replacement of Contacts and Terminal Panelsa. Turn power off to boiler and all controls.Allow boiler to cool to 80˚F (27˚C)
3NOTCHNOTCH5 / 5-MTERMINAL PANELORIENTATION 241BLUE RED33142ACETOWER TUBEFITTING HUBSWITCHHOUSINGTERMINALCONNECTIONSSWITCHCOVERPUMPTERMINALPANEL
STEP 2 - Testinga. Turn on power to boiler and pump circuits.With the boiler empty, the pump should turn on (5 or 5-M switch models) or the valve open
Comentários a estes Manuais